Tom Wright’s claims against Penn Station through-running, checked against the record
Tom Wright runs the Regional Plan Association. In two 2026 interviews he made sixteen claims against running trains through Penn Station. Each appears here in his words, with the part he gets right and what the studies and passenger counts show.
Tom Wright is president and CEO of the Regional Plan Association (RPA). He also chairs the New Jersey State Planning Commission, a post to which Governor Phil Murphy appointed him in January 2020. In May 2026 he argued against through-running at Penn Station in a short interview made for social media. In September he argued it again on a 45-minute podcast. Both times he said it will not work at Penn Station.
Wright objects on five grounds: late trains, narrow platforms, train cars, rail yards, and the one-way morning rush. The studies he relies on tested one plan, in which every train runs through and keeps carrying passengers. In July 2026 the Federal Railroad Administration (FRA) tested a different plan. Some commuter trains run through, and the rest end at Penn Station or go to a yard. The FRA found that the existing station could handle 32 trains an hour under the Hudson River, up from 24. Several of Wright's statements also contradict what RPA has published.
Amtrak owns Penn Station and has paid RPA since 2018 to build public support for Gateway. RPA's 2022 and 2024 proposals to Amtrak each listed a report on through-running at Penn Station and said what it would conclude. RPA billed Amtrak for hosting the August 2024 forum quoted on this page. The records are set out below the claims.
The capacity figures on this page come from the FRA, not from Amtrak. In April 2025 the Trump administration's Department of Transportation took control of the Penn Station project, and it assigned the capacity study to the FRA. Amtrak's project has since dropped the southern expansion and lists limited through-running among its aims. What changed in 2025 is set out at the end.
Six Terms and Two Plans
- Through-running
- A train arrives from one side of Manhattan and leaves from the other without reversing.
- Turning back
- A train arrives, reverses, and leaves the way it came.
- Drop-and-go
- A train brings passengers in, then runs empty through the station to a storage yard.
- Dwell
- The time a train stands at the platform.
- Trains per hour
- Trains through the Hudson River tunnels in the busier direction. The limit today is 24.
- Peak direction
- Toward Manhattan in the morning, away from it in the evening. Reverse-peak is the opposite.
A New Jersey train carries passengers through Penn Station to a new turnback station in Queens or the Bronx.
It turns and comes back west in the same rush hour. The study says it takes an East River tunnel slot that a fuller Long Island train could have used.
Result: 40 trains an hour in the rush-hour direction. The railroads want 48.
Up to four commuter trains an hour continue in passenger service in each direction.
Others drop their passengers and run empty to Sunnyside Yard in Queens, as they do today.
Most other NJ Transit trains end at Penn Station and turn back.
Result: up to 32 trains an hour under the Hudson inside the existing station, up from 24.
Six Patterns Across the Claims
Wright's objections have force against one plan: every train running through, carrying passengers, on today's narrow platforms. In both interviews he applies them to through-running of every kind.
He counts people and concludes about trains
Ten people ride in for each one riding out. That is true of passengers. In the 8:00 AM hour in 2019, 27,223 people rode into Manhattan from New Jersey by rail and 2,490 rode out. They rode 25 trains in and 12 out. Every train that arrives must leave the platform, full or empty.
He treats one plan as the only plan
The railroads' October 2024 study ran every train through Penn Station and turned it around at a new station on the far side. It found that the returning trains take tunnel slots from rush-hour trains. The study says so of that plan: “a 100% through-running service at Penn Station with far-side turnbacks is inherently inefficient and would prevent full utilization of the tunnel tracks by peak-direction trains.” The FRA ran some trains through and ended the rest at the station or a yard. It reached 32 trains an hour.
He treats today's ridership as permanent
The morning rush is becoming less one-sided. NYMTC counted 10.6 rail passengers entering Manhattan below 60th Street for each one leaving from 7 to 10 AM in 2019. In 2024 it counted 8.3. The Penn Station Master Plan forecast in June 2020 that morning peak-hour boardings at Penn Station would rise from 4,610 in 2019 to at least 13,300 in 2042. Transport for London and the Department for Transport found in May 2025 that the Elizabeth line is driving about 71,000 additional public transport trips each weekday.
He picks one small market to stand for all of them
Few people commute from New Brunswick to Ronkonkoma. A train on that route also stops at Newark, Secaucus, Penn Station, and Jamaica, and it carries every trip between them. The MTA's April 2021 white paper counts “over 400,000 daily trips” between Manhattan, Queens, and the nearest New Jersey counties.
He puts it off without a date
“I’d love to do through-running as a future step,” Wright said. RPA's own April 2026 report says the groundwork cannot wait: “The railroads should start now to address these very real institutional constraints so they are resolved when the tunnels come on line.” Amtrak's June 2026 agreement with the developer rebuilding Penn Station lists “the introduction of at least limited through-running on the regional rail network” among the project's aims.
He contradicts RPA's reports, and himself
In January 2014 Wright told POLITICO: “Through-running trains would create more capacity.” RPA's Fourth Regional Plan said of the planned Penn South expansion: “A far better scheme would be to build the station for through-running trains from the get-go.” Its February 2020 paper, with Wright among the authors, said “Through-running would improve capacity.” Its April 2026 report says limited through-running “could be employed to modestly increase capacity at Penn Station.” In September Wright said “it won't add capacity at Penn Station.”
- March 2008RPA, report on the ARC tunnelNJ Transit's plans “were insufficient because they did not continue directly to the East Side of Midtown.”
- January 2014Wright, then RPA's executive director, to POLITICO“Through-running trains would create more capacity.”
- August 2017RPA, Crossing the HudsonChange the existing station “to increase station capacity, reduce congestion at the platform level and enable through-running regional rail.”
- November 2017RPA, Fourth Regional Plan“A far better scheme would be to build the station for through-running trains from the get-go.”
- February 2020RPA, The Case for Penn South, Wright a co-author“Through-running would improve capacity.” In the existing station it is “unworkable.”
- August 2024WSP, the railroads' consultant, at RPA's forum“100% through-running is efficient at Penn Station itself but diminishes overall performance throughout the rest of the regional network”
- April 2026RPA, Penn Station reportLimited through-running “could be employed to modestly increase capacity at Penn Station.”
- May 2026Wright, interview“It actually reduces capacity that way.”
- July 2026FRA, Phase I reportThrough-running “can materially increase overall throughput.”
- September 2026Wright, podcast“it won't add capacity at Penn Station.”
The region has more than one center.
Wright says the region's jobs are in Midtown and, to a smaller degree, downtown. One check is daytime population: how many more people are in a place during the workday than live there. Manhattan is far ahead. A second tier of job centers stands behind it.
Places that fill up by day
Downtown Brooklyn, Long Island City, Newark, New Haven, White Plains, Stamford, and New Brunswick gain people during the workday. Newark, New Brunswick, Stamford, and New Haven are stops on the Northeast Corridor, which runs through Penn Station. Downtown Brooklyn, Long Island City, and White Plains are a transfer away.
Places that empty out
Jamaica and Paterson lose people by day. More workers leave them each morning than arrive. Jersey City, Hoboken, and Bridgeport come out nearly even.
What the measure can do
Daytime population shows which places a study of demand should include. It does not count riders. An estimate of ridership on a through train needs a model of where people start and end their trips along that route.
The Sixteen Claims
Each claim appears in Wright's words, followed by what it means, the part of it that holds up, and what the record shows.
"The demand in our region is so heavily peaked, in the morning there are 10 people coming in for every one person going out. And in the evening it reverses and most of the demand is going out and not as much as coming in."
So many more people ride into Manhattan than out in the morning that a service carrying passengers both ways cannot pay.
The number is right for passengers. In the 8:00 AM hour in 2019, NYMTC, the regional planning council, counted 27,223 rail passengers entering Manhattan from New Jersey and 2,490 leaving: 10.9 to 1. From Queens the ratio was 14.0 to 1 (33,540 against 2,393). Across 60th Street it was 17.6 to 1 (35,826 against 2,035). At Penn Station, the April 2022 Master Plan report counted 60,820 passengers getting off trains and 4,610 getting on in the morning peak hour: 13.2 to 1.
Wright's number counts people. Trains ran about 2 to 1. The 27,223 passengers from New Jersey rode in on 25 trains. The 2,490 going out rode 12. The railroads' October 2024 study gives the same outbound figure: “about 12 commuter trains from New Jersey turn back at Penn Station to provide reverse-peak-direction revenue service in the morning peak hour.”
Every train that arrives has to leave the platform, full or empty. RPA's April 2026 report describes how they leave across the day: “about 38% of the trains drop passengers at Penn Station and then run through to a yard”; another 18 percent run through as Amtrak trains; 44 percent turn back. The passenger ratio measures how full the departing trains are. The number of trains that arrive sets the number that must depart.
The ratio is falling. From 7 to 10 AM across all rail lines, NYMTC counted 201,007 passengers entering Manhattan below 60th Street and 19,049 leaving in 2019: 10.6 to 1. In 2024 it counted 152,422 and 18,383: 8.3 to 1. Outbound rail travel is back to 96.5 percent of its 2019 level. Inbound rail travel is back to 76 percent.
The planners expect the same. The Penn Station Master Plan's June 2020 forecast puts morning peak-hour boardings at Penn Station at 4,610 in 2019 and 16,900 in 2042 if Gateway and the Penn South expansion are built. Passengers getting off rise from 60,820 to 104,400. The ratio falls from 13.2 to 1 to 6.2 to 1. If neither is built, the forecast is 5.8 to 1 (76,900 against 13,300). For 2032 to 2042 the planners assumed outbound morning ridership would grow 1 percent a year. In the rush-hour direction they assumed one-quarter of 1 percent for the LIRR and one-eighth for NJ Transit.
NYMTC Hub Bound Travel Data Report 2019, Appendix III, Section C, for hourly passengers and trains; Appendix II, Table 14B, for 7 to 10 AM. NYMTC Hub Bound Travel Data Report 2024, Appendix I, Table 12, and Appendix II, Table 14B. Penn Station Master Plan Alternatives Report, April 2022, Figure 3-18. Penn Station Master Plan, Comparison of Travel Demand Scenarios, June 2020 (workbook), Demand sheet. October 2024 WSP/FXC feasibility study. RPA's April 2026 report.
"Through-running requires you to kind of equalize those flows. Every train that comes in has to become a train going out during the peak hour."
Through-running needs as many trains going out as coming in, and rush-hour demand runs one way.
For a station where every train keeps carrying passengers past Penn Station, the limit is real. The railroads' October 2024 study tested that plan. New Jersey trains turned back at new stations in Queens or the Bronx, and Long Island trains turned back in New Jersey. The study found that “a 100% through-running service at Penn Station with far-side turnbacks is inherently inefficient and would prevent full utilization of the tunnel tracks by peak-direction trains.” A train carrying passengers past the station also has a timetable to keep on the far side, where the tracks favor the rush-hour direction. Of the four tracks between Harold Interlocking in Queens and Jamaica, RPA's April 2026 report notes, “Three of these tracks are used by trains running in the peak direction, with one track set used for trains running in the reverse-peak direction.”
Most rush-hour trains at Penn Station already go out the other side. Petra Messick of Amtrak described the move, called drop-and-go, at RPA's August 2024 forum: “It's a through-running move. And over 50% of the peak hour trains in Penn Station already use that through-running move. It's how we can operate over 1,300 daily trains at Penn.” Those trains bring passengers in and run empty to Sunnyside Yard in Queens or the West Side Yard.
RPA's April 2026 report finds that the station moves the most passengers when every train runs through, to a yard or from one: “converting all operations at Penn Station to revenue-to-non-revenue (drop-and-go) and non-revenue-to-revenue service would result in the highest passenger through-put at Penn Station.” It calls turning back the move to avoid: “Turn-backs are very time intensive and should be avoided, except for the stub end tracks where they are the only option.”
The FRA's recommended plan mixes the two. Up to four commuter trains an hour run through in each direction. Most other NJ Transit trains end at longer platforms on the south side of the station. Morning drop-and-go continues. The plan reaches 32 trains an hour under the Hudson in the morning rush.
October 2024 WSP/FXC feasibility study, Section 5.2. RPA and Municipal Art Society forum, August 5, 2024 (recording), Amtrak presentation. RPA's April 2026 report. FRA, New York Penn Station Service Optimization Study, Phase I Report, Executive Summary and Section 4.2.
"That train going out, and it's basically going to be a nearly empty train going out and it might be replacing a full train that would have been coming in."
A through train leaves Penn Station nearly empty and takes the place of a full train that could have come in.
This is Wright's strongest point about operations. The October 2024 study found that its plan to run every train through would deliver “peak direction throughput of only 40 tph between the regional rail network and Penn Station, less than the required 48 tph.” The reason: trains that turn around on the far side come back through the tunnels in the rush-hour direction.
In that study the lost slots come from the turnaround, and the study says so. A New Jersey train that continues east and turns in Queens comes back west and claims “a westbound slot in the East River tunnel that otherwise could be used by more heavily patronized trains from Long Island in the peak direction of LIRR travel.” The study names the plan that causes the loss: “a 100% through-running service at Penn Station with far-side turnbacks.” Exhibit A shows both plans.
The departing train itself takes nothing from inbound trains under the Hudson. RPA's April 2026 report describes the existing Hudson tunnels as “a single eastbound and single westbound track.” A westbound train in the morning uses the track that inbound trains cannot use.
RPA recommends the same move. Its April 2026 report proposes a “second run” in the rush hour: “a NJ TRANSIT train might drop its passengers and continue to the LIRR branch line to pick up a second run, replacing an LIRR train that would have otherwise been turned at Penn Station. This kind of exchange would eliminate the need to turn a train and would save space in the railyard.”
A train that turns around holds its platform longer. The FRA reports that NJ Transit allows 22 minutes for a train to turn at Penn Station. On the wide platform in the FRA's second plan, its model finds that passengers “can be fully alighted and boarded within 2.5 minutes.” Exhibit H compares the times.
October 2024 WSP/FXC feasibility study, Section 5.2.1. RPA's April 2026 report. FRA, New York Penn Station Service Optimization Study, Phase I Report, Section 4.
"It actually reduces capacity that way. ... The simple truth is that through-running here it might actually reduce capacity in the overall system [because] you're running empty trains in the off peak direction that are replacing full trains that would have been coming in."
Run trains through Penn Station and the whole rail system carries fewer people.
RPA's April 2026 report concludes that “converting Penn Station entirely to revenue-to-revenue through-running service within the existing footprint would likely reduce regional rail capacity and one-seat service to Penn Station.” It calculates 66 trains an hour on today's platforms, “only 72% of the future tunnel capacity.” The October 2024 study failed both of its through-running designs on how they would operate. WSP, the railroads' consultant, told RPA's August 2024 forum that running every train through “diminishes overall performance throughout the rest of the regional network.”
The FRA finds the opposite at the station: “Through-running train operations, both revenue and non-revenue, at Penn Station can materially increase overall throughput by eliminating the time and operational complexity associated with turning trains within the station.” It names “conflicting train flows resulting from the mixing of terminal and through operations” as one of two things that limit service today.
The railroads' consultant agreed in public. WSP's slide at the August 2024 forum read: “100% through-running is efficient at Penn Station itself.” Foster Nichols of WSP, presenting it, called full through-running “a great idea at the station itself, and it sends the trains through the station faster.” The MTA's April 2021 white paper says: “A train running through a station generally needs less time at the platform (dwell time) than a turning train, also potentially increasing throughput.” RPA's Fourth Regional Plan says: “All service ends in Manhattan, preventing trains from traveling through from one part of the region to the other, and reducing the capacity of the system overall.”
The October 2024 study's own table credits its full through-running design with 24 more trains an hour under the Hudson. That is the highest figure among the four designs it tested. It credits its smaller through-running design with 16. It marks both “No” under “Maintains Existing Level of Bi-Directional Commuter Service?”
RPA's figure of 66 depends on how long it assumes a train stands at the platform. The report gives a through train 12 minutes: 6 for passengers to get off, 4 to get on, 2 to spare. It allows the 4 boarding minutes in the morning rush, when the Master Plan count shows 13 passengers getting off for each one getting on. On wide platforms RPA's own estimate falls to 7 minutes.
FRA, New York Penn Station Service Optimization Study, Phase I Report, Sections 1 and 3.3.4. RPA and Municipal Art Society forum, August 5, 2024 (recording), WSP presentation, slide 30. MTA, Penn Station Master Plan White Paper: Through-Running, April 2021. RPA, Fourth Regional Plan, “Combine three commuter rail systems into one network”. October 2024 WSP/FXC feasibility study, Table E-1. RPA's April 2026 report. Penn Station Master Plan Alternatives Report, April 2022, Figure 3-18.
"It's been studied several times by consultants and the railroads, and they've kind of looked at whether there's a way of getting additional capacity out of Penn Station by switching to this regime. And the answer is no, it just doesn't work."
Consultants and the railroads have studied through-running at Penn Station several times and found no added capacity.
Two studies support him. The railroads' October 2024 study found both of its through-running designs unworkable. RPA's April 2026 report concluded that “Penn Station with its current orientation still cannot meet the peak tunnel capacity.” The railroads' conclusion at RPA's August 2024 forum, in RPA's summary: “The through-running or hybrid configurations that stay within the footprint of the existing station fall short of this goal.” The FRA's recommended plan stops at 32 trains an hour. Its second plan, with eight through trains an hour, failed its first computer simulation.
The newest study answers yes. The FRA released its Phase I report on July 15, 2026. It tested 86 scenarios, including “varying degrees of through-running commuter rail service between New York and New Jersey.” Through-running is one of four principles the study is built on. The plan it recommends “introduces limited through-running commuter service”: up to four commuter trains an hour in each direction. The plan also adds stairs and escalators, lengthens three platforms, and shortens the time trains stand at them. Together these changes reach 32 trains an hour under the Hudson in the morning rush, inside the existing station. The report does not say how much of the gain comes from through-running alone.
Wright cites that result in the same interview. He describes a new report that finds the station can go from 24 trains an hour to 32. Those are the FRA's figures. The plan that produces them runs commuter trains through the station.
The FRA's second plan supports “up to eight regional commuter through-running trains per hour in each direction.” It produced a timetable at 32 trains an hour. It then failed its first simulation because trains arrived late and because LIRR trains crowded the West Side Yard. One of the FRA's two fixes is more through-running: the crowding “could be avoided by developing a service plan with LIRR trains turning on the platform or a higher percentage of through-running commuter trains.” The FRA will test that in Phase II.
The earlier work is thinner than “studied several times” suggests. The October 2024 study cites “detailed rail operations simulations conducted collectively by WSP, Amtrak and NJ TRANSIT” for the time it takes to clear a platform. I asked Amtrak under the Freedom of Information Act for the models behind the study. Amtrak answered on February 9, 2026: “The work was led by MTA (and their consultant). We have no native files, operational models (because no simulations were performed) or calculation workbooks.” At the August 2024 forum, an audience member asked WSP about its concept for a regional metro service. WSP answered: “Nothing in this presentation was prescriptive or the result of an analysis; it was to illustrate the concept.”
RPA is not a bystander to these studies. It billed Amtrak for hosting that forum and for “extensive feedback” on Amtrak's through-running presentation. Its own report on through-running was on the list of work it proposed to Amtrak, conclusion included. The records are under “RPA and Amtrak,” below the claims.
FRA, New York Penn Station Service Optimization Study, Phase I Report, Executive Summary and Section 4.3. October 2024 WSP/FXC feasibility study. RPA's April 2026 report. Amtrak response to FOIA request 26-FOI-00272, February 9, 2026. RPA, “Expanding Capacity and Improving Penn Station,” September 17, 2024. RPA, forum audience Q&A, August 5, 2024. Closed! podcast, 25:07 for the 24-to-32 figures.
"New Jersey Transit and the Long Island Railroad are running double-decker trains, which take a long time for people to get off of."
NJ Transit and the LIRR run double-decker cars that empty slowly, so trains here cannot stop as briefly as trains in London or Paris.
NJ Transit runs them. RPA's April 2026 report says its fleet “includes many double-decker passenger cars, including all the new cars purchased since 2006.” The LIRR runs double-decker cars out of Penn Station on trains such as the Cannonball to Montauk. WSP told RPA's August 2024 forum that the short stops in ReThinkNYC's through-running plan would need different cars. In RPA's summary, “it would require NJTransit replacing their fleet of bi-level trains for a new fleet which would provide faster egress, but lower passenger capacity.”
RPA's own report says the LIRR will keep running single-level cars: “Long Island Rail Road (LIRR) is also committed to purchasing double-decker passenger cars where they make sense, but tunnel height restrictions will require single level vehicles well into the future.”
The FRA finds the delay in the station, not the cars. Its Phase I report names too few stairs and escalators as “the primary constraint to platform clearance.” It finds that adding them is “an effective strategy to reduce dwell times at Penn Station.” With up to 23 new stairs and escalators and less clutter, platforms clear and board “an estimated 2.4 minutes faster than currently, an improvement of 28 percent.”
RPA said the same in 2020. The platforms “aren't large enough,” it wrote, and “there is not enough vertical circulation (stairs, elevators, and escalators).”
Double-decker trains make short stops in a station built for them. Alon Levy, whose essay on the subject is titled “Don't Run Bilevels,” reports that rush-hour trains on Paris's RER A, a double-decker fleet, stop for “about 50-60 seconds at Les Halles.”
RPA's April 2026 report. MTA, “LIRR's Cannonball,” May 23, 2016. RPA, “Expanding Capacity and Improving Penn Station,” September 17, 2024. FRA, New York Penn Station Service Optimization Study, Phase I Report, Executive Summary. RPA, The Case for Penn South, February 2020. Alon Levy, “Don't Run Bilevels,” Pedestrian Observations, January 4, 2018.
"The Elizabeth line brilliantly creates through running ... Well London has kind of two things. One is it has more central business districts and places where you want to go. ... they're all on one line."
Through-running works in London because London has several business districts on one line. New York does not.
London has several business districts, and the Elizabeth line links the West End, the City of London, and Canary Wharf on one east-west route. The shape of a city affects which rail services fill up. WSP's survey for the railroads, in RPA's summary, found that “regional metro systems typically operate in purpose-built infrastructure, separate from existing historic train sheds.”
One city center is enough. Munich's S-Bahn gives “direct rail links connecting surrounding towns and communities with Munich city centre” over one route through the center. All eight lines share it, 30 trains an hour each way. Its builders designed it for 250,000 passengers a weekday. It carries about 840,000.
Zurich built a new line, the Durchmesserlinie, so that more trains could pass through its main station. Railway Technology describes the old terminal platforms: “reversal is still time consuming and an inefficient use of platform and track space.” In Tokyo, the Ueno–Tokyo Line joined lines that had ended on either side of the center. The Japan Railway & Transport Review reported trips 7 to 10 minutes shorter. It expected rush-hour crowding on the parallel section to fall from 197 percent of capacity to under 180.
London runs a second through line north to south. The Thameslink program raised it from 16 trains an hour to 24.
RPA made the comparison itself in 2020: “Through-running service would serve a similar function to Crossrail in London or RER service in Paris to get commuters into or through the city center with speed and efficiency.” The FRA built its study on “four principles that have been proven to maximize capacity at major rail stations around the world.” Through-running is one of them. Applied to the existing Penn Station, they produce the FRA's 32 trains an hour.
Deutsche Bahn, 2nd core route Munich, “The situation today”. Railway Technology, Zurich cross-city link. Japan Railway & Transport Review No. 66, October 2015. Rail Technical Strategy, Thameslink core case study. RPA, “Expanding Capacity and Improving Penn Station,” September 17, 2024. RPA, The Case for Penn South, February 2020. FRA, New York Penn Station Service Optimization Study, Phase I Report, Executive Summary and Section 3. Heywood's 2016 MIT thesis, Multi-Scale Regional Transportation Governance, which compares Penn Station with Châtelet-Les Halles in Paris.
"In New York City it's really Midtown Manhattan. ... [Ariel] It's always Midtown and maybe downtown and that's that."
The region's jobs are in Midtown and, to a smaller degree, downtown. Nowhere else matters to the rail network.
Midtown Manhattan is by far the region's largest job center, and Lower Manhattan is second. Wright told RPA's August 2024 forum that “Manhattan still remains the greatest concentration of jobs, and where we expect most of the job growth in the future to occur.” Most morning riders are going there.
Where passengers get off does not decide where the train stops running. A train can deliver most of its riders to Penn Station and keep going.
Wright argued for the other centers at the same forum: “It's very desirable to try and improve connectivity between sub-centers for balanced regional growth.” RPA's Fourth Regional Plan faulted the commuter railroads on this point: “Reverse service into many job centers with strong growth potential, such as Bridgeport or Hicksville, is poor—and limits the ability of those downtowns to grow into major economic hubs.” RPA's June 2022 report on Gateway said that if more people work from home, “through-running service and an integrated regional rail network could be even more critical to reducing auto traffic and expanding economic opportunity when jobs will be scarcer and more dispersed throughout the region.”
Census records show the two markets moving apart. The Census Bureau links each private-sector job to the county where the worker lives. From 2019 to 2023, jobs with neither end in Manhattan grew 7.8 percent to 296,621 across 18 pairings, such as New Jersey to Brooklyn and the Bronx to Brooklyn. Jobs held in Brooklyn by New Jersey residents grew 13.6 percent. Jobs linking New Jersey and Manhattan in either direction fell 1.9 percent to 336,032.
Daytime population shows where the other centers are. Downtown Brooklyn, Long Island City, Newark, New Haven, White Plains, Stamford, and New Brunswick all gain people during the workday. Newark, New Brunswick, Stamford, and New Haven are stops on the Northeast Corridor, which runs through Penn Station. Exhibit C gives the figures.
RPA and Municipal Art Society forum, August 5, 2024 (recording), audience questions. RPA, Fourth Regional Plan, “Combine three commuter rail systems into one network”. RPA, Gateway and the Post-COVID Economy, June 2022. U.S. Census Bureau, LODES 8 origin-destination files, 2019 and 2023, private-sector primary jobs by home and work county. NY–NJ–CT daytime population atlas.
"The few commuters who actually are, say, interested in going from New Brunswick to Ronkonkoma say. ... There's not a lot of demand for that."
Too few people travel from a suburb on one side of Manhattan to a suburb on the other to justify reorganizing the railroads.
Few people make that trip. The MTA's April 2021 white paper counts work trips from the New Jersey counties with rail service to Nassau and Suffolk at “only about 3,000 in each direction.” It counts about 300,000 from the same counties to Manhattan.
New Brunswick to Ronkonkoma is one pair of stations. A train on that route also stops at Newark, Secaucus, Penn Station, and Jamaica. It carries every trip between them, including the trips that end at Penn Station.
Wright opened RPA's August 2024 forum by listing “better connections between suburban communities” among RPA's priorities for the new tunnels.
The larger markets across the rivers lie close to Manhattan. The same MTA paper counts “over 400,000 daily trips” between Manhattan, Queens, and the nearest New Jersey counties. Census data for 2023 count 30,840 private-sector workers who live in New Jersey and work in Brooklyn, 23,645 who work in Queens, and 21,916 who work on Long Island.
Wright made this point himself in January 2014. He told POLITICO that the case for through-running did not rest on riders going from New Brunswick to New Haven. It rested on Penn Station: “Through-running trains would create more capacity.”
New service produces trips that earlier counts could not show. Transport for London and the Department for Transport found in May 2025 that the Elizabeth line is driving about 71,000 additional public transport trips each weekday.
MTA, Penn Station Master Plan White Paper: Through-Running, April 2021. RPA and Municipal Art Society forum, August 5, 2024 (recording), opening remarks. U.S. Census Bureau, LODES 8 origin-destination files, 2019 and 2023. Sarah Laskow, “Beyond local,” POLITICO, January 27, 2014. Elizabeth line post-opening evaluation, Transport for London and Department for Transport, May 2025.
"They don't care if it's a one seat ride to any of the other branches. They only care about the line that takes them to where they want to go."
Riders care only about the train to their own destination. A through train to some other branch is no use to them.
Riders want a direct train to where they are going. RPA's April 2026 report counts ten branch lines on each side of Penn Station and 100 possible pairings. No timetable can run all 100 often.
RPA has argued before that a direct ride past Penn Station matters. Its March 2008 report on an earlier Hudson tunnel plan, called ARC, recalls its position that NJ Transit's designs “were insufficient because they did not continue directly to the East Side of Midtown, where large numbers of west-of-the-Hudson commuters were destined.” The report's ridership table puts 30,000 morning riders on an extension to Madison Avenue.
Petra Messick of Amtrak told the August 2024 forum that Gateway's goal is access to Penn Station “with a direct one-seat ride, which is really important to commuters on all lines, all days, all times.”
A through network gives every branch a direct ride to every station on the shared trunk line. The October 2024 study describes how riders reach the other branches: by “disembarking and waiting on the same platform for a subsequent train that runs to their desired destination.”
RPA, ARC & NYC: The New Trans-Hudson Rail Tunnel: Making It Work Best, March 2008, Table 3. RPA and Municipal Art Society forum, August 5, 2024 (recording), Amtrak presentation. October 2024 WSP/FXC feasibility study, section on trunk-and-branch networks. RPA's April 2026 report.
"On all those trains in the morning, 99% of the people are going to get off when they get to Penn Station. ... the ratio of people doing what we call a reverse commute, going out of the city in the morning and back in in the evening, is close to 100 to 1, as best as I can figure it out, still today."
Morning trains empty out at Penn Station and almost no one gets on, so a through train would leave carrying almost no one.
The morning rush runs heavily one way. Every published count for the peak hour shows at least ten riders arriving for each one leaving.
No published count comes near 100 to 1. The April 2022 Penn Station Master Plan report counts 60,820 passengers getting off and 4,610 getting on at Penn Station in the morning peak hour: 13.2 to 1. NYMTC's 2019 count shows 27,223 rail passengers entering Manhattan from New Jersey against 2,490 leaving in the 8:00 AM hour: 10.9 to 1. Across all rail lines that hour the ratio is 14.0 to 1.
The newest count is lower. NYMTC's 2024 report counts 152,422 rail passengers entering Manhattan from 7 to 10 AM and 18,383 leaving: 8.3 to 1. Counting every way of traveling, it finds that people going against the rush made up “about 26% of morning peak travel.”
The planners' forecast is lower again. The Penn Station Master Plan's June 2020 forecast for the 2042 morning peak hour is 104,400 passengers getting off at Penn Station and 16,900 getting on if Gateway and Penn South are built: 6.2 to 1. If neither is built it is 76,900 and 13,300: 5.8 to 1.
Wright's own figure in May 2026 was “10 people coming in for every one person going out.” Four months later he said close to 100 to 1.
Penn Station Master Plan Alternatives Report, April 2022, Figure 3-18. NYMTC Hub Bound Travel Data Report 2019, Appendix III, Section C. NYMTC Hub Bound Travel Data Report 2024, summary, Appendix I, Table 12, and Appendix II, Table 14B. Penn Station Master Plan, Comparison of Travel Demand Scenarios, June 2020 (workbook), Demand sheet. Ariel Viera × Tom Wright interview, May 6, 2026.
"That service is never going to be that attractive to you. ... And the service is just never going to be very frequent."
Through trains at Penn Station can never run often enough to attract riders.
If the railroads spread through trains across every possible pairing of branches, each pairing would run rarely. RPA's April 2026 report counts 100 pairings and concludes that “the odds that the branch you started on is scheduled to continue on your destination branch are very low.”
How often trains run depends on the plan. The October 2024 study describes one: “branch lines operating on 15-minute peak headways on each branch, with a total of six branches feeding a common trunk line operating at 24 tph.”
The FRA's longer-term option for Penn Station supports “up to eight regional commuter through-running trains per hour in each direction.” That is a train every seven and a half minutes, in addition to four Amtrak through trains an hour.
Foster Nichols of WSP told the August 2024 forum that trains on a regional metro service “could get to twelve trains per hour per track,” with “a two or three-minute dwell-time.”
RPA's April 2026 report does not compare how often trains would run under a through-running timetable and under today's.
October 2024 WSP/FXC feasibility study, section on regional metro service. FRA, New York Penn Station Service Optimization Study, Phase I Report, Executive Summary. RPA and Municipal Art Society forum, August 5, 2024 (recording), WSP presentation. RPA's April 2026 report.
"What are you more likely to do? I'm going to take the first express train into New York City. I'd like to have a beautiful Penn station where I can make an easy transfer. And then I will take ... the next train out to Ronkonkoma."
A handsome rebuilt Penn Station with easy transfers does the job. Riders can change trains there.
A Penn Station with good concourses and clear signs is worth building. Riders will change trains in any network. For some trips, the first express and a change at Penn Station will beat waiting for a direct train.
A better concourse adds no trains, and adding trains is Wright's own test. At the August 2024 forum he said RPA comes at Penn Station “from a capacity issue first.” He dropped RPA's call to move Madison Square Garden for the same reason. The federal government would not pay for it, he said, “because it will not add capacity to the system.”
RPA said as much about the last new hall. Its February 2020 paper: “Moynihan is not a panacea for the majority of the problems with Penn Station.”
The project now under way does both. Amtrak's June 2026 agreement with Penn Transformation Partners, the developer, lists open concourses and “the introduction of at least limited through-running on the regional rail network” in one scope of work.
The FRA compares its changes inside the existing station with the plan to expand it. They “could provide up to a third of the additional capacity envisioned under the previous Penn Station Expansion project at a fraction of its estimated $16.7 billion cost.”
RPA and Municipal Art Society forum, August 5, 2024 (recording), audience questions. RPA, The Case for Penn South, February 2020. Amtrak, announcement of its agreement with Penn Transformation Partners, June 22, 2026. FRA, New York Penn Station Service Optimization Study, Phase I Report, Executive Summary.
"I'd love to do through-running as a future step. But the higher priority [today] has got to be creating more capacity under the Hudson River."
Through-running is a fine idea for some later date. The new Hudson tunnels come first.
The Hudson tunnels limit how many trains can reach Penn Station, and no change in operations adds a track under the river. The obstacles to through service are real. RPA's April 2026 report notes that “NJ TRANSIT and LIRR trains use different electrical systems” and that through-running “would need to account for differences in rolling stock as well as labor and governance issues across agencies.” RPA has put the tunnels first since 2017. Its report that year said: “Once the Gateway tunnels and Javits bus terminal are both complete, the next priority is to expand capacity under the Hudson River by converting Gateway to a higher-capacity, through-running service.”
RPA's own report says not to wait. “The railroads should start now to address these very real institutional constraints so they are resolved when the tunnels come on line.”
- June 2026Amtrak and its developer sign the agreement under which they will finish the station's design.
- July 2026The FRA's Phase I report finds room for 32 trains an hour with some trains running through.
- 2028The FRA's Phase II report is due.
- 2030Metro-North's New Haven Line trains are set to begin running to Penn Station.
- 2038The new Hudson tunnel project is due to be finished, by RPA's 2024 account.
The new tunnel does not add the capacity by itself. Petra Messick of Amtrak told the August 2024 forum that “the tunnel project is more of a resiliency project than a capacity project in itself, if no other investments are made.” The FRA says the new tunnel's capacity “will be underutilized” unless the station's two limits are dealt with.
Through trains have run here with no new construction. RPA's Regional Express Rail plan said through trains between New Jersey and Connecticut “can happen today without any new construction.” RPA's April 2026 report cites the “Train to the Game,” which ran NJ Transit trains on Metro-North's New Haven Line for events at the Meadowlands, and says: “This strategy of revenue-to-revenue through-running should be expanded to include additional sports games and special events.”
Amtrak and its developer are designing the station now. The FRA says the design “will keep this Penn Station Future option open by preserving space for future stairs and escalators and avoiding new structural columns where tracks are removed and platforms are widened.” Amtrak's June 2026 agreement lists “the introduction of at least limited through-running on the regional rail network” among the project's aims.
RPA's April 2026 report. RPA, Crossing the Hudson, August 2017. RPA, “Expanding Capacity and Improving Penn Station,” September 17, 2024. RPA and Municipal Art Society forum, August 5, 2024 (recording), Amtrak presentation. FRA, New York Penn Station Service Optimization Study, Phase I Report, Executive Summary and Section 1. RPA, Rx: Regional Express Rail. Amtrak, announcement of its agreement with Penn Transformation Partners, June 22, 2026. Heywood, Rebecca J. (2016), Multi-Scale Regional Transportation Governance: Evaluating Cooperation and Decision-making at New York Penn Station, on the Meadowlands trains and the obstacles between the railroads.
"It's not that through running wouldn't be useful, because it would be nice to create some of those those connections, but it won't add capacity at Penn Station, which is really what we're trying to do."
Through-running would be convenient. It would not let Penn Station handle more trains. Only more tracks and platforms do that.
RPA's 2020 paper favors through-running, but only in an expanded station. It says “efficient through-running of revenue service is unworkable at the existing Penn Station.” The October 2024 study found its two through-running designs unworkable. Through-running is one part of the package that takes the FRA's plan to 32.
Wright said the opposite in January 2014. He told POLITICO: “It's that Penn Station is a disaster.” “Through-running trains would create more capacity.” POLITICO reported then that running trains through and turning them at less crowded stations would let 25 percent more trains use Penn Station.
“Through-running trains would create more capacity.”
“it won't add capacity at Penn Station”
The FRA says through-running adds capacity. “Through-running train operations, both revenue and non-revenue, at Penn Station can materially increase overall throughput by eliminating the time and operational complexity associated with turning trains within the station.” Turning a train around at the station, the report says, “can add 15 to 25 minutes or more under constrained conditions.”
RPA's April 2026 report says the same of the existing station: “Limited applications of revenue-to-revenue through-running could be employed to modestly increase capacity at Penn Station during the shoulder of the peak periods and serve sports and special events at the Meadowlands.”
RPA said so in August 2017. Its report that year faulted Gateway because it “limits service options by maintaining Penn Station as a terminus, rather than allowing through running between New Jersey and Long Island.” It proposed changes to the existing station “to increase station capacity, reduce congestion at the platform level and enable through-running regional rail.” First on its list: “Widen select existing PSNY platforms.” It estimated that Gateway run through to Queens would raise capacity under the Hudson by 138 percent. Gateway ending at Penn Station doubles it.
RPA said so again in February 2020, in a paper that lists Wright among its authors. “Through-running would improve capacity by providing travelers with direct crosstown service between New Jersey and Long Island and reduce the amount of time trains spend boarding at Penn Station.” The same paper credited through-running with “increasing the number of trains and passengers that Penn Station can handle.” Exhibit B sets these statements in order.
Sarah Laskow, “Beyond local,” POLITICO, January 27, 2014. FRA, New York Penn Station Service Optimization Study, Phase I Report, Section 3.3.4. RPA's April 2026 report. RPA, Crossing the Hudson, August 2017. RPA, The Case for Penn South, February 2020. October 2024 WSP/FXC feasibility study.
"There will have to be some sort of expansion project of some type. ... We don't know how big it needs to be until we know how much we can handle at the existing Penn Station, but there will be a need to expand Penn Station somewhere to create more tracks and platforms so that more trains can come through."
Penn Station will have to be expanded. The only open question is by how much.
The gap is real so far. The FRA says Gateway could raise capacity under the Hudson from 24 trains an hour to as many as 48, and its Phase I plan reaches 32. The October 2024 study and RPA's April 2026 report both conclude that the rail system must be expanded somewhere.
Wright states the conclusion and, in the same sentence, names what is missing from it. No one yet knows how much the existing station can handle. The FRA's Phase II is meant to find out. The FRA says Phase II will “evaluate the potential to reach a higher maximum number of trains per hour” and “will be completed in 2028.”
The FRA has not found the limit. “Additional station capacity is feasible; however, exceeding a potential maximum of 32 TPHPD requires broader, regionwide improvements that address the reliability and consistency of trains arriving at the station.” Phase II will study those improvements.
RPA's own report leaves the kind of expansion open. It calls for “a station expansion or some other form of system expansion.” Wright told Crain's New York Business in August 2025 that RPA does not support the southern expansion of the station that Amtrak proposed and “has not endorsed any specific plan.” Until Phase II reports in 2028, no one knows how large the gap is.
FRA, New York Penn Station Service Optimization Study, Phase I Report. FRA, Service Optimization Study page. RPA's April 2026 report. October 2024 WSP/FXC feasibility study. Caroline Spivack, “RPA accepted at least $850K from Amtrak as part of its Hudson Tunnel advocacy,” Crain's New York Business, August 27, 2025.
The Test That Would Settle It
One published comparison would settle most of these sixteen claims. It would run Penn Station two ways and change nothing else. It would also show how much of any gain comes from through-running and how much from new stairs, longer platforms, and shorter stops.
- Tracks and platforms
- Passengers
- Train cars
- Late arrivals
- Standard for staying on time
- Trains per hour on each branch
- Passengers carried
- Minutes of delay
- Yard space needed
- Cost
The FRA has said that Phase II, due in 2028, will test a plan with more through-running. Wright's concerns about late trains, yards, and outbound service belong in that test. The result is not in.
RPA and Amtrak
RPA describes itself as “an independent non-profit civic organization.” Amtrak owns Penn Station. Since April 2025 it has led the project to rebuild it, under the U.S. Department of Transportation. Since 2018 Amtrak has paid RPA to build public support for Gateway. Amtrak's own records, released under the Freedom of Information Act, show what the money bought. The full set is in the document archive, and a separate page examines RPA's April 2026 report.
Why Amtrak hired RPA. An Amtrak message of April 16, 2018 gave the reason for the contract. RPA, it said, “has unique credibility as an independent voice for sound regional policies and planning decisions.” It called RPA “a non-profit organization perceived as an independent voice” whose fundraising from others “will leverage Amtrak's investment in the campaign.” It also said: “RPA has already begun this work on a pro bono basis.”
What RPA asked Amtrak to pay. RPA's proposals asked Amtrak for $100,000 in March 2018, $350,000 for the 18 months from October 2020, $350,000 for 18 months in its 2022–23 proposal, and $500,000 for the 18 months from January 2024. Crain's New York Business reported on August 27, 2025 that Amtrak had given RPA at least $850,000 in grants over three years. Wright told Crain's the money has not influenced RPA's positions.
The through-running report was on the list. The 2022–23 proposal promised Amtrak “a mid-sized report on Penn Station Through-Running.” The 2024–2025 proposal said what the report would find: “It will discuss how the conversion of the station to a full, through-running operation is technically challenging and would lead to significant disruptions, and explain why expanding Penn Station to the south is a way to achieve a version of Penn as a through-running station — one that will lead to the greatest increase in capacity and help achieve long-term visions for a more integrated regional network.” RPA's invoices to Amtrak follow the work. June 2023: “Began two research projects, one on through running.” November 2023: “Completed an outline for the upcoming through-running report and made substantial progress on research.” RPA published its report on through-running at Penn Station in April 2026. The report does not mention Amtrak's payments.
RPA helped Amtrak prepare its case, then hosted the forum. RPA's invoices say it “Met with Amtrak team for a working session on their revised through-running presentation, gave extensive feedback” (invoice of February 2024), briefed elected officials on “our joint through-running strategy” (March 2024), and “worked with Amtrak to finalize the through-running analysis presentation” (the next invoice). The invoice for August 2024 says RPA “prepared logistics for and hosted Expanding and Improving Penn Station forum at NYU on August 5” and drafted “an event recap piece, an op/ed, and a technical paper.” While the presentation was in preparation, an email signed from RPA on March 8, 2024 said of ReThinkNYC's through-running plan: “if their dwell times don't work we need to say why, and if they *do* work we need to then show the other problems.”
- January 2020RPA email, in Amtrak's filesA draft of The Case for Penn South goes out for review. The note says RPA “wanted to push back a bit on the critics who are arguing for through-running.”
- June 2022RPA's 2022–23 proposal to AmtrakRPA promises “a mid-sized report on Penn Station Through-Running.”
- June 2023RPA invoice to Amtrak“Began two research projects, one on through running”
- For January 2024 onRPA's 2024–2025 proposal to AmtrakThe report will “explain why expanding Penn Station to the south” leads “to the greatest increase in capacity.”
- February 2024RPA invoice to Amtrak“Met with Amtrak team for a working session on their revised through-running presentation, gave extensive feedback”
- March 2024RPA invoice to AmtrakRPA briefs elected officials on “our joint through-running strategy.”
- September 2024RPA invoice to AmtrakRPA “prepared logistics for and hosted Expanding and Improving Penn Station forum at NYU on August 5.”
- April 2026RPA's Penn Station reportRPA publishes its report on through-running at Penn Station. The report does not mention Amtrak's payments.
The 2020 paper. An email of January 31, 2020, in Amtrak's files, shows RPA sending out a draft of The Case for Penn South for review before publishing it. The note says the paper “helps make the case for Penn South” and adds: “We also wanted to push back a bit on the critics who are arguing for through-running.”
Acknowledging the money. An email of August 9, 2022, in Amtrak's files, answers RPA's invitation to a dinner. The writer declines “to avoid the appearance of a conflict of interest” and tells RPA it is not “necessary to acknowledge Amtrak's support in a prominent fashion at this particular event.”
The advisory group. Amtrak, NJ Transit, and the MTA convened the Station Working Advisory Group in September 2024, with Wright as a co-chair. The railroads' opening presentation said its members would “Serve as champions to help build support for investment in Penn Station.” RPA's invoice to Amtrak of November 2024 lists, among the work billed, that an RPA officer “continued his role as co-chair of SWAG for Penn Station.” Wright is now a member of the group and no longer a co-chair. The change is set out below.
Testimony to the Gateway Development Commission. The commission is the public authority that coordinates the Gateway Program. Its vice chair is Tony Coscia, Amtrak's commissioner. RPA's invoices bill Amtrak for writing and delivering comments at the commission's board meetings. The invoice of January 2023: “wrote testimony for 12/12 GDC Board Meeting + encouraged BGN coalition to provide comment.” The invoice of March 2024: “Drafted testimony for two GDC Board Meetings on 2/16 and 2/28 and testified in person.” Fifteen of the invoices Amtrak released, dated October 2021 to March 2025, list such work.
The commission's own minutes name a commenter from RPA or its Build Gateway Now Coalition at 34 of the 38 board meetings it held from March 2021 through September 2026. RPA's website and its invoice record a 35th, on February 16, 2024. RPA did not comment at three meetings: May 6, 2024; August 28, 2024; and August 20, 2025. The last was held two days after the New York Daily News sent RPA its questions about the Amtrak money, the newspaper reported.
RPA's written comments appear in 27 of the commission's public-comment files, and RPA has posted 33 of its comments on its own website. None mentions Amtrak's payments. The Daily News editorial board made the same charge in August 2025: RPA spoke, it wrote, “never once disclosing the fact that Amtrak was paying.”
Shared people. Petra Messick, who presented Amtrak's case at the August 2024 forum, worked at RPA for twelve years before she joined Amtrak in 2012. Her published biography says she began at Amtrak by “crafting the narrative about the need for the Gateway Program and building support among key stakeholders.” In July 2025 she and Wright arranged a call under the subject line “FRA Analysis Ideas.” Anthony Coscia has chaired Amtrak's board since 2013. He is also Amtrak's commissioner and the vice chair of the Gateway Development Commission. He sits on RPA's board, and RPA listed him as a director in 2017. RPA's board page lists him as “Anthony Coscia,” a partner at the law firm Windels, Marx, Lane & Mittendorf. It does not mention Amtrak or the commission. The commission's own page lists him as “Tony Coscia, Amtrak Commissioner & Vice Chair.” RPA's board also includes executives of WSP, the firm that wrote the railroads' October 2024 study; of Madison Square Garden Entertainment, whose arena sits on top of the station; and of Vornado Realty Trust, which owns the office towers at One and Two Penn Plaza.
What Changed in 2025
Through 2025 Amtrak paid RPA for work that included the case against through-running and for a southern expansion of the station. Amtrak's project now lists limited through-running among its aims and has dropped the expansion. Amtrak did not change course by itself. The Trump administration took over the project, replaced the people leading it, and gave the capacity question to the FRA.
Until April 2025. The railroads ran two projects. The MTA led Penn Reconstruction, the rebuilding of the existing station. Penn Station Expansion would have added tracks and platforms under Block 780, the block south of 31st Street between Seventh and Eighth Avenues. On October 2, 2024, Amtrak's chief executive, Stephen Gardner, said of the railroads' feasibility study: “This study demonstrates that to meet the needs of the region, we must expand the station beyond its existing footprint to deliver the passenger capacity promised by the Gateway Program.” The FRA puts the cost of that expansion at $16.7 billion.
The takeover. Gardner resigned on March 19, 2025. His statement gave the reason: “I am stepping down as CEO to ensure that Amtrak continues to enjoy the full faith and confidence of this administration.” On April 17, President Trump's Transportation Secretary, Sean Duffy, announced that the FRA was “withdrawing the Metropolitan Transportation Authority (MTA) from leading the Penn Station Reconstruction project.” Amtrak, “backed by USDOT,” would lead instead. The department withdrew the MTA's $72 million grant. On May 27 Duffy appointed Andy Byford special advisor to Amtrak's board to run the project. Byford, the department said, would “report directly to the Amtrak directors and coordinate closely with the Department of Transportation.” Amtrak then merged the two projects into one, “bringing previously separate initiatives, New York Penn Station Capacity Expansion and New York Penn Station Reconstruction under a single, unified project structure.” A year later Duffy described the change: “We took over the transformation of New York Penn Station.”
- September 2024Amtrak, the MTA, and NJ TransitThe three railroads convene the Station Working Advisory Group. Wright is a co-chair.
- October 2024Stephen Gardner, Amtrak's chief executive“we must expand the station beyond its existing footprint”
- March 19, 2025AmtrakGardner resigns.
- April 17, 2025U.S. Department of TransportationThe FRA removes the MTA from the lead of Penn Reconstruction. Amtrak will lead, “backed by USDOT.”
- May 27, 2025U.S. Department of TransportationThe Secretary appoints Andy Byford to run the project as special advisor to Amtrak's board.
- June 2025RPA invoice to AmtrakThe last invoice that bills Amtrak for the “role as co-chair of SWAG for Penn Station.”
- October 2025FRAThe FRA begins the Service Optimization Study.
- November 2025RPA invoice to AmtrakThe last RPA invoice in the records Amtrak released.
- May 20, 2026U.S. Department of Transportation and Amtrak's boardThe project will bring “the introduction of at least limited through-running on the regional rail network.”
- July 15, 2026FRA, Phase I reportThe existing station can handle 32 trains an hour under the Hudson, up from 24.
- July 16, 2026Amtrak, to the advisory group“Amtrak confirmed that the Project will not demolish Block 780.”
- September 2026Wright, podcast“it won't add capacity at Penn Station.”
The FRA tested the station. Amtrak did not. The department gave the capacity question to the Federal Railroad Administration, the agency that withdrew the MTA and cut Amtrak's grant. The FRA began its Service Optimization Study in October 2025 and published Phase I on July 15, 2026. That report is the source of the 32 trains an hour cited throughout this page. It calls the southern expansion “the previous Penn Station Expansion project.” The FRA consulted Amtrak, NJ Transit, and the MTA. The study is the FRA's own. Its finding carries a condition, stated in the report: “These throughput gains are dependent on key assumptions regarding dwell-time reductions and operational changes.”
What Amtrak says now. On May 20, 2026, the department and Amtrak's board said the rebuilt station will “Expand track capacity, including the introduction of at least limited through-running on the regional rail network.” At the advisory group's meeting of July 16, 2026, a member asked whether the project includes a southern expansion or the demolition of Block 780. The summary records the answer: “Amtrak confirmed that the Project will not demolish Block 780.” The same summary says Amtrak “supports the FRA’s Service Optimization Study producing a neutral, data-driven evaluation of the alternatives to increase capacity within the station footprint.”
RPA's seat. In October 2024 Amtrak said the advisory group “is co-chaired by Regional Plan Association President & CEO Tom Wright” and Sarah Kaufman of New York University. RPA billed Amtrak for the role. Seven of its invoices, for months from September 2024 through June 2025, bill for the co-chair's work. The June invoice lists the “role as co-chair of SWAG for Penn Station” among the work charged. The invoice for July 2025 does not. Amtrak's page for the group now lists “Tom Wright – Regional Plan Association” among the members and names no chair. An Amtrak representative opened the meetings of November 2025 and July 2026. Both summaries list Wright among those attending.
What stayed the same. Anthony Coscia still chairs Amtrak's board. RPA kept billing Amtrak after the takeover. Its invoices for April through July 2025 charge for meetings “regarding the future of Penn South.” Its invoice for September 2025 says RPA “Researched and began writing report on Penn Station operations.” The last invoice in the records Amtrak released is dated November 1, 2025. RPA commented at the Gateway Development Commission's meeting of September 29, 2026. That month Wright said through-running “won't add capacity at Penn Station,” two months after the FRA reported that it “can materially increase overall throughput.”
No capacity figure on this page rests on Amtrak's word. The figures come from the FRA's Phase I report and from the railroads' October 2024 study, and each is linked. Amtrak's records are used for one purpose: to show what Amtrak paid RPA to do.