Penn Station & Gateway
Document Archive
Reports, drawings, contracts, and correspondence on Penn Station, Gateway, and related rail planning.
Start with a question
What limits Penn Station capacity?
Read the federal operating study alongside NJ Transit’s modeling review and earlier capacity work.
- New York Penn Station Service Optimization Study — Phase I Report75 pages · 2026-06
- NJ Transit review of Service Optimization Study RTC modeling2 pages · 2026-03-24
- Penn Station Capacity Improvements Project — Final Report174 pages · 2020-01-13
What did PCIP propose?
Start with the 2020 report, its conceptual drawings, and the Phase 2 alternatives.
- Penn Station Capacity Improvements Project — Final Report174 pages · 2020-01-13
- PCIP Appendix A — Conceptual Design Preliminary Drawings54 pages · 2019-07-22
- Penn Station Capacity Improvements Project Phase 2 — Final Report86 pages · 2021-01-01
Amtrak–RPA contracts
Trace the Build Gateway Now work through an approval email, a campaign proposal, and an extension scope.